Close Menu
NewsjauntsNewsjaunts
  • Homepage
  • News
  • Business
  • Politics
  • Entertainment
  • Music
  • Award
  • Contact Us
  • About Us
  • Privacy Policy
  • Africa-Newsroom

Subscribe to Updates

Get the latest creative news from News about art, design and business.

What's Hot

Abiodun Pledges Appointment, Fee Refunds to Discourage “Bitter” APC Primaries

May 6, 2026

How to Boost Your Mood, Lower Stress in Just 10 Minutes a Day

May 6, 2026

Ogun PDP Youth Leader Ejalonibu Charges Central Youths: “Arise and Take the PDP Back to Governance”

May 5, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
NewsjauntsNewsjaunts
Subscribe
  • Homepage
  • News
  • Business
  • Politics
  • Entertainment
  • Music
  • Award
  • Contact Us
  • About Us
  • Privacy Policy
  • Africa-Newsroom
  • Home
  • Politics
  • NEWS
  • Business
  • Finance
  • Business
  • Entertainment
  • Contact Us
  • About Us
  • Privacy Policy
NewsjauntsNewsjaunts
Home » FG Announces 2-day Total Closure of Third Mainland Bridge
Infrastructure

FG Announces 2-day Total Closure of Third Mainland Bridge

NewsjauntsBy NewsjauntsNo CommentsOctober 30, 20202 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp VKontakte Email
Share
Facebook Twitter LinkedIn Pinterest Email
Third Mainland Bridge for repairs

The federal government has announced a two-day total closure of the Third Mainland Bridge in Lagos state for “concrete work on some sections”. 

Olukayode Popoola, federal controller of works in the state, who disclosed this on Thursday, said the closure would begin from midnight of October 30 and end at midnight of November 1.

The controller said there was the need to shut both bounds of the bridge – from Adeniji Adele to Adekunle – in addition to the closed bound of the bridge, to complete the work.

“We are planning to cast two number expansion joints, and we shall close the Third Mainland Bridge from midnight of Oct. 30 until midnight of November 1,’’ he said.

According to him, the closure is to ensure that there is no vibration on the bridge during casting in-place of the newly-installed expansion joints.

“This is to allow for setting of the special concrete, which allows the concrete to achieve its required compressive strength,’’ Popoola said.

He said the federal government decided to close the bridge on a weekend to minimise the impact on vehicular traffic.

Popola promised that traffic managers will be deployed to control all the alternative routes.

The Third Mainland Bridge, which is going through series of repair, was partially shut on July 24 for repair.

The repair is expected to last for six months, divided into two phases of three months on each carriageway, starting with the Oworonsoki bound carriageway.

Between October 9 and October 11, a section of the bridge from Adekunle to Adeniji Adele was shut to complete the first stage of casting works.

Bridge Lagos
Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
Previous ArticleEid-El-Maulud: Adebutu Joins Muslims In Celebation, enjoins Muslims to imbibe meekness, service to God
Next Article Senate Queries Foreign Affairs Ministry for ‘Spending N248m Without Approval’
Newsjaunts
  • Website

Related Posts

Abiodun Commissions Roads in Ijebu-Ode, Clears Air on Ogun Oil Exploration

January 30, 2026

Magboro–Makogi Road: Residents Commend Ogun Govt, Seek Speedy Completion

November 5, 2025

Hon. Tolulope Phillips Commends Governor Dapo Abiodun for Airport Project, says the project is a “giant stride”

October 8, 2025

Lagos Assembly Wades Into Power Crisis at Estate Managed by President Tinubu’s Brother

September 21, 2025
Leave A Reply Cancel Reply

Our Picks
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • LinkedIn
  • TikTok
  • Telegram
  • WhatsApp
Don't Miss
News

Abiodun Pledges Appointment, Fee Refunds to Discourage “Bitter” APC Primaries

By NewsjauntsMay 6, 20260

ABEOKUTA – Governor Dapo Abiodun of Ogun State has moved to forestall internal friction within…

How to Boost Your Mood, Lower Stress in Just 10 Minutes a Day

May 6, 2026

Ogun PDP Youth Leader Ejalonibu Charges Central Youths: “Arise and Take the PDP Back to Governance”

May 5, 2026

Meta expands AI-powered age assurance measures to strengthen teen safety online

May 5, 2026

Interswitch Welcomes Largest-Ever Developer Academy Cohort, Strengthening Africa’s Tech Talent Pipeline

May 5, 2026

Subscribe to Updates

Get the latest creative news from News Jaunts

About Us

Newsjaunts is a well-established journalism business dedicated to delivering high-quality news reporting, breaking news, and comprehensive investigative reporting.

Our team of experienced journalists provides in-depth local news coverage, compelling news stories, and insightful news analysis. Stay informed with our timely news updates and informative news articles.

Trust Newsjaunts for accurate and reliable news coverage. Contact us today to stay updated on the latest news globally.

Email: info@newsjaunts.com, newsjaunts@gmail.com

Whatsapp: +2348182744804
Call: +2348078097457

Facebook X (Twitter) Instagram
Our Picks

Abiodun Commissions Roads in Ijebu-Ode, Clears Air on Ogun Oil Exploration

January 30, 2026

Magboro–Makogi Road: Residents Commend Ogun Govt, Seek Speedy Completion

November 5, 2025

Hon. Tolulope Phillips Commends Governor Dapo Abiodun for Airport Project, says the project is a “giant stride”

October 8, 2025

Lagos Assembly Wades Into Power Crisis at Estate Managed by President Tinubu’s Brother

September 21, 2025
New Comments
    Newsjaunts
    Facebook X (Twitter) Instagram Pinterest WhatsApp RSS
    • Homepage
    • News
    • Business
    • Politics
    • Entertainment
    • Music
    • Award
    • Contact Us
    • About Us
    • Privacy Policy
    • Africa-Newsroom
    © {2026} SEMEL-NJ MEDIA AND INFORMATION TECHNOLOGY

    Type above and press Enter to search. Press Esc to cancel.

    WhatsApp us